Project Command

Every job on one board that moves itself from what the field reports — checkpoints, photos, hold-ups and weather — with the crew app, the money and the paperwork all living on the job.

The operating system for post-frame and barndominium builders.

Instead of: A whiteboard, a shared calendar, a photo app, a separate invoicing tool, and a folder structure only one person understands.

Project details
Client PortalLink EstimateArchiveDelete
Hostetler Equipment Shed
Post-FrameCrews:Crew Aall 4 acceptedConcrete Crew 1 of 2 accepted+ Add crewDale Hostetler
1840 Meetinghouse Rd, Gap, PA 17527
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Scroll — 10 steps
The problem

The job is in six places

The schedule is on a whiteboard, the photos are on the foreman's phone, the change order is in an email, the invoice is in the accounting software, and what the crew is actually owed is in someone's head. Nothing is wrong with any one of them. What is wrong is that no one can see the job. The operating system for post-frame and barndominium builders puts it back in one place.

Six tools that each know a sixth of the job add up to nobody knowing the job.

Project pipeline board
Kickoff2
$182,600.00
Zimmerman 40×72 Shop
$128,400.00
Dale Whitmore
Awaiting material payment
Materials3
$241,900.00
Detweiler 30×40 Garage
$71,900.00
Marcus Feld
Ordered ✓Awaiting delivery
Build4
$496,300.00
Hutchins 60×80 Barndominium
$214,700.00
Dale Whitmore
View in Schedule
Wrap-Up1
$54,200.00
Stoltzfus 24×32 Detached Garage
$54,200.00
Sheila Nunez
Awaiting final payment
Complete2
$147,850.00
Beiler 36×48 Equipment Shed
$88,100.00
Marcus Feld
Review requested ✓
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Beat one

Every job, one board

Jobs sit on a schedule you can see across — who is on what, what is running late, what is about to start. Drag to move it and the dates move with it. The owner sees the whole season in one look and stops carrying it around in his head.

A whiteboard shows where the jobs were when somebody last wiped it.

Build Schedule
Project / Task
Hostetler Equipment ShedCrew A
Zimmerman Horse BarnCrew B
PermittingAug 4 – Aug 18
Dirt WorkAug 18 – Aug 22
ConcreteAug 22 – Aug 28
Material DeliveryAug 28 – Sep 1
Post SetSep 1 – Sep 11
Stoltzfus ShopCrew C
Byler BarndominiumCrew A
Jul 27– Aug 2
Aug 3– Aug 9
Aug 10– Aug 16
Aug 17– Aug 23
Aug 24– Aug 30
Aug 31– Sep 6
Sep 7– Sep 13
Sep 14– Sep 20
Sep 21– Sep 27
Sep 28– Oct 4
Oct 5– Oct 11
Oct 12– Oct 18
Oct 19– Oct 25
Oct 26– Nov 1
TODAY
Permitting 4/4
Post Set 3/6
Siding / Roofing 0/11
46% • 38d
Permitting+3d
Concrete
Post Set0/6
Permitting 1/4
Framing 0/6
Siding / Roofing 0/11
Permitting 0/4
Slab / Foundation 0/6
Post Set 0/6
Siding / Roofing 0/11
Shutdown week — Crew B
OVERLAP
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Beat two

The crew runs its day from one link

No app to install, no password. The crew opens its link and Today has the day on it: Ridgeline Post Frame, Ray Wenger's 40×60 shop, on site at 6:50, the framing stage — and three big buttons, Clock In, Add Photo and Blocked. Along the bottom, five doors — job chats, two unread; photos; today; the crew; and his hours, where each man sees his week with approved and waiting kept apart. A crew that can see its own hours and progress trusts the numbers, and takes pride in the week.

Hours on scraps of paper and photos stuck on a foreman's phone reach the office on Friday, if they reach it at all.

Ridgeline Post Frame
Ray Wenger — 40×60 Shop
On site
6:50 AM
Ray Wenger — 40×60 Shop
Framing
Clock In
Add Photo
Blocked
Your jobs
Ray Wenger — 40×60 ShopMon, Oct 5 → Fri, Oct 16
The crew app's Today screen before clock-in — whose company, the job, three big buttons and the five-door bar. Real screen · sample data.
Beat three

Stages carry their own checklists

Each stage carries the checkpoints that have to be true before it can close — post set, girts done, trusses up — and the ones that matter want a photo. When the last one is ticked, the stage closes and the board moves on its own. Nobody drags cards around to keep it honest, and the crew gets the satisfaction of closing the stage themselves.

A stage marked done because somebody said so is a stage you find out about at the final walkthrough.

Stage checkpoints
Framing Details
CheckpointsEdit
Post Set3 photos
Post SetGirts DoneTrusses Up
Girts Done2 photos
Equipment on Site
Trusses Up
Bracing Complete
Framing Inspection
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Beat four

Every photo files itself to the job and the stage

A photo taken from the crew's link files itself: the job from the shift he's clocked into, the stage the job is on, who took it and when. So when you open a job in the gallery, four hundred photos are six lines. The Hutchins 60×80 shop: 412 photos — dirt work 38, concrete 74, framing 126, siding and roofing 150 — each stage with the dates it ran. Open one stage, or every stage at once. Nobody sorts photos on a Sunday, and the right photo is there when a customer asks.

Photos across six phones and a group chat are worth nothing on the day you need one.

Gallery — one job, by stage

Hutchins 60×80 shop

412 photos · 6 sections
One job opened in the gallery — its photos in a section per build stage, every section closed, with Open every stage. Real screen · sample data.
Beat five

Circle the problem on the photo itself

Open a photo and mark it up: draw, drop numbered arrows on what matters, add text, in red, yellow, white or green, as thick as you need. On the trusses-set photo it's arrow 1, arrow 2, a ring round the truss on the lift and one note — strap truss 7 before steel — and the note can be spoken instead of typed with gloves on. The markup sits on top; the photo underneath is never changed, so the original is always there. One marked-up photo says what a paragraph can't, and the crew lead who spotted it is understood the first time.

“See the crease near the top?” in a text is a conversation. An arrow on the photo is an answer.

Mark up the photo
Cancel
Trusses Set · IMG_4412.jpg
Done
Thickness
100%
The mark-up editor over a photo — Draw, Arrow, Text, Undo, Redo, four colours and the thickness slider, drawn by the product's own mark renderer. Real screen · sample data.
Beat six

A hold-up is written down with its cause and the days it cost

From the roof, the crew taps Blocked and picks a reason, and the office knows that minute. In the office, a delay is logged against the stage with its cause — weather, crew no-show, material, equipment, permit, site access, scope change — the days and hours it cost, and the photos that prove it: two days and four hours on the Hostetler shed's post set, after two inches of rain overnight. Your promised dates stay put, so a slip shows instead of being quietly swallowed. Crews like being able to say “it wasn't us” with proof.

Hold-ups remembered at the end of a job all sound like the weather. Written down as they happen, they show what really costs you days.

Report a delay
Report a delay
Post Set · Hostetler Equipment Shed
What caused it?
WeatherCrew No-ShowMaterial IssueEquipmentPermit DelaySite AccessScope ChangeOther
Days lost
2
Hours lost
4
What happened?
Two inches of rain overnight. Post holes filled and the skid loader could not get to the back line without cutting up the yard.
Photos (2)
Jobsite progress photoJobsite progress photo
Add photos
CancelSave delay
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Beat seven

Every job gets its own forecast, read for the trade

Each job site gets its own weather, read the way a crew needs it. Gusts of 21 mph at the Scherer pole barn means hold the sheets; 29 mph at the Nolt horse barn means the sheets will fly. The crew sees it on their phone in the morning, and the history stays with the job for the day someone asks why a stage ran long. Nobody drives an hour to a site they can't work.

One forecast for the office's town tells you nothing about a roof sixty miles away.

Every job, its own weather
Three jobs, one morning
Scherer Pole Barn
Independence, MO
Gusts 21 mph — hold the sheets
94°
21 mph
Nolt Horse Barn
Wichita, KS
Gusts 29 mph — sheets will fly
101°
29 mph
Sheaffer Shouse
West Des Moines, IA
78% rain — wet steel
88°
16 mph

Independence to Wichita is two hundred miles. One is a caution and one is a hard stop, on the same morning. Every project carries its own site forecast.

The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Beat eight

The money lives on the job too

Open a project and the invoices, the change orders, the contract, the plans and what the crew is owed are all there, on the thing they belong to, instead of in four systems that each know a quarter of the story. Your PM answers the customer's question while he's still on the phone.

Four systems that each know a quarter of the story never add up to the job.

Crew payout
Crew payout
Crew A · figured for 12 days · 361h logged over 11 days
Refresh
Pool
$21,840
Day rates earned
$15,833
Fuel & equipment
$3,300
Surplus shared
$2,708
WhoTierHoursDaysDay ratesSurplusOwed
Levi YutzyTier 19611$5,500.00$720.00$6,220.00
Dwayne MillerTier 29210.5$4,200.00$690.00$4,890.00
Curt HershbergerTier 38810$3,500.00$660.00$4,160.00
Andre OcampoTier 4859.75$2,632.50$637.50$3,270.00
Total to the crew$18,540.00

Hours come from what the crew logged on their field links. Day rates are earned per day worked; the surplus is split by share of hours, so being there is what moves it.

The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Beat nine

It tells you when the plan and reality part company

A stage that has run past its planned duration, a schedule that has drifted out of sequence, a crew that is costing more per day than the ladder says it should — you find out while you can still do something about it. That's what control feels like for an owner: hearing it early, not at the final invoice.

Finding out a stage ran long from the final invoice is finding out when it's too late to matter.

Stage performance
StageRunsPlannedActualVarianceLong / shortDays lostPhotos
Permitting
Top cause: Permit Delay · 21d
34/381418.6+4.622 / 521d12 (0 shown)
Dirt Work
Top cause: Weather · 9d
41/4233.4+0.411 / 99d96 (41 shown)
Concrete
Top cause: Weather · 14d
39/4156.1+1.117 / 814d188 (79 shown)
Materials Delivery
Top cause: Material Issue · 26d
37/4058.2+3.224 / 326d74 (11 shown)
Framing
Top cause: Crew No-Show · 11d
33/3687.4-0.69 / 1811d402 (166 shown)
Siding / Roofing
Top cause: Weather · 12d
28/3178.9+1.916 / 612d311 (140 shown)
Final Payment
26/27330.04 / 4—58 (26 shown)
The real screen, drawn from the product’s own design system. Sample data — no customer information appears here.
Every part of it, in detail
Build Schedule
One timeline showing every live job, every stage inside it, and where each crew is on any given day.
Project board that moves itself
Every column on the project board is reached by doing the work, not by somebody remembering to drag a card.
Stage checkpoints
Every stage carries a checklist of the actual work inside it, and ticking the last one finishes the stage.
The crew app
Your crew's whole day on their own phone — clock, swipe camera, checklist, Blocked, the job chat — and a record that shows every man his own growth. One link each, no password, built only for post-frame and barndominium builders.
When a stage has drifted out of order
When a stage ends up running before the one above it in the build order, the schedule names it, says what it does to your dates, and offers to put it back.
Delay reporting
Marking a stage delayed opens one focused form: pick a cause, say how many days, describe what happened, attach photos.
Site weather — a call for every crew on the job
Not the weather — whether today's plan still works. Gusts, the dry window and a call for each trade — then a dated record of what the weather actually did to every job.
Photo gallery — every job, every photo
Every photo on every job, in one place: an endless grid, a cover per job opened into its build stages, or the day it was taken — and one search that reaches them all.
Mark up a photo
Circle it, point at it with numbered arrows, write the note on the photo — typed or spoken — and the photo itself is never changed.
Working days
Stage lengths are counted in the days your crew actually works, so a five-day stage never quietly runs through a weekend.
Jobsite punch clock
One tap in, one tap out — and the hours come off two real moments instead of a Friday guess.
Crew ticks the work off from a phone
The crew ticks the same checkpoints the office does, from a link on their phone, and it means exactly the same thing.
Jobsite photos
The crew shoots from a phone, and two visibly different buttons decide whether a photo goes in the job file or in front of the customer.
Blocked on site, one tap
A crew taps one of eight reason chips and the office knows in that minute — the stage is flagged delayed, and your promised dates do not move.
The project cockpit
One window per job with everything about it — crews, stages, the money, the photos, the job's chat and what the customer is seeing — and every section a card that shows its news before you open it.
Change orders
Price a mid-job scope change, get it signed, and turn it into money — with the days it adds and the reason for it on the record.
Invoicing
Invoices built from the estimate and the payment schedule — so the number on the invoice is the number they agreed to, at the customer's prices, never your cost.
What this crew is owed for this job
A panel inside the job showing what the crew is owed and how it got there — the pool, the pay, the equipment, the surplus and every man's line — for crews on day rates, hourly + shared surplus or a share of the labour price. It refuses to guess when it cannot work something out.
How the work went, and how the plan changed
Two questions kept deliberately apart: how the plan has changed, and how the work actually went. We only serve post-frame and barndominium builders, so the numbers compare post set with post set, not with a kitchen remodel.
Hours and labour cost across the whole team
Everything every crew has logged, priced with the same arithmetic each job's payout uses — who carries the hours, what each crew costs, and what a crew day actually runs at.
THE SYSTEM, END TO END

Run one of your builds
from one board.

Every job on one board that moves itself from what the field reports — checkpoints, photos, hold-ups and weather — with the crew app, the money and the paperwork all living on the job. Twenty minutes, on one of your real structures — and the link we build is yours to keep whether or not you go any further.

leads2build.com
Windows set into a finished wall
Trusses being set on a post-frame building
Leads2BuildBUILDER OPERATING SYSTEM
Laminated columns standing in a post-frame shell
Leads2BuildBUILDER OPERATING SYSTEM
Project Command — Leads2Build