Stage templates by building type

Each building type gets its own stage list — names, colours, lengths and checkpoints — editable by your company.

The operating system for post-frame and barndominium builders.

Part of The Launch Pad
What it is

One template per building type: Post frame, Barndominium and Non-niche to start with, and you can add your own. Each stage carries a name, a colour, a default length and its checkpoints. Starting a job copies that template onto it, so a barndominium starts from a barndominium plan instead of a generic one. We don't build software for plumbers or remodelers — only for builders like you, so the stages are a pole barn's stages: permitting, dirt work, concrete, material delivery, post set, siding and roofing.

Also called: stage presets · post frame stages · barndominium stages · set up my build stages · customise stages

See it, piece by piece
01

Post Set, not Framing — the stages are named the way you build

Each building type carries its own stage list, colours, default lengths and checkpoints. The post-frame template renames Framing to Post Set; the barndominium template also renames Concrete to Slab / Foundation. Rename, reorder, add or remove stages, so a shed stops carrying a barndominium's stage list and the board reads in the words your crews already use.

Project Phases
Project phases3 of 6 doneNow: Siding / Roofing1 behindManageAdd Phase
Drag the grip on the left of any stage to reorder the build.
Permitting
Jul 27 – Aug 8 • 12 days4/4
Done
Concrete
Aug 8 – Aug 13 • 5 days6/6
Done
Material Delivery
Aug 13 – Aug 17 • 4 days4/4
Done
Post Set
Aug 17 – Aug 26 • 9 days3/6
Active
Siding / Roofing
Aug 26 – Sep 3 • 8 days0/11
Planned
Final Payment
Sep 3 – Sep 6 • 3 days0/5
Planned
The Hostetler shed's phases — Post Set where a generic tool would say Framing. Real screen · sample data.
Without it

The board says Framing, the crew says Post Set, and the new hire spends his first week translating between them.

Why we built it

Crews talk about post set, not framing, and a board in their own words is one they actually read. Each building type carries its own list, so a shed stops dragging a barndominium's stages behind it and a new hire learns the job in the words the crew already uses.

Sound familiar?“my stages aren't the same as everyone else's”
02

The default order is the order you actually build in

You grade, fill and compact the pad, then you form and pour on it. The factory templates were corrected to say so; the earlier order put concrete first, which is backwards on every real site. It matters because the template is what every new job is copied from, and a wrong default gets copied by whoever starts a job in a hurry.

Without it

A new job copies a plan with the slab poured before the pad is graded, and the one nobody catches goes out to the crew that way.

Why we built it

Whoever starts a job in a hurry takes the default as it comes, so the default has to be right. Grading before pouring is how every real site runs, and getting the template right once means no job goes out to a crew backwards.

Sound familiar?“a shed doesn't have the same stages as a barndominium”
03

Renaming a stage doesn't silently break what's attached to it

Every stage keeps its own lasting identity behind the display name, so a notification rule or an email template stays attached through a rename. Before that existed, a renamed stage kept its old name underneath and a newly added stage had no identity at all — so it could never carry a rule in the first place.

Without it

Renaming Framing to Post Set quietly cuts off the framing-finished email, and nobody notices until a customer asks why the updates stopped.

Why we built it

An owner who renames a stage should not silently lose the customer email that hangs off it. Every stage keeps a lasting identity behind its name, so notification rules and templates follow it through a rename — and a stage you add yourself can carry them from day one.

Sound familiar?“I want to rename Framing to Post Set”
04

Write down what "ready for inspection" means once

Stages and checkpoints carry written explanations any crew member can read from the item itself, so the standard travels with the checkbox instead of living in the explanation you gave a new hire in the truck. Correct the wording and it reaches jobs already running, the same day. New men can answer their own question without calling the office.

Without it

Every new hire learns a different version of "done" from whoever trained him in the truck.

Why we built it

New men don't want to call the office to ask what "ready for inspection" means. Writing the standard on the checkpoint itself answers it on site, the same way for every crew — and a correction reaches jobs already running the same day.

Sound familiar?“the default stage order is wrong for how I build”
05

Twelve stage colours chosen so two bars are never confusable

Stage colour is data, not decoration — it is how you read the board from the far side of the office. Colours come from a fixed set, and a stage you added yourself keeps its own colour instead of falling back to grey. Where two same-status stages run back to back, the board shades them slightly apart so they don't merge into one block.

Build Schedule
Project / Task
Hostetler Equipment ShedCrew A
Zimmerman Horse BarnCrew B
PermittingAug 4 – Aug 18
Dirt WorkAug 18 – Aug 22
ConcreteAug 22 – Aug 28
Material DeliveryAug 28 – Sep 1
Post SetSep 1 – Sep 11
Stoltzfus ShopCrew C
Byler BarndominiumCrew A
Jul 27– Aug 2
Aug 3– Aug 9
Aug 10– Aug 16
Aug 17– Aug 23
Aug 24– Aug 30
Aug 31– Sep 6
Sep 7– Sep 13
Sep 14– Sep 20
Sep 21– Sep 27
Sep 28– Oct 4
Oct 5– Oct 11
Oct 12– Oct 18
Oct 19– Oct 25
Oct 26– Nov 1
TODAY
Permitting 4/4
Post Set 3/6
Siding / Roofing 0/11
46% • 38d
Permitting+3d
Concrete
Post Set0/6
Permitting 1/4
Framing 0/6
Siding / Roofing 0/11
Permitting 0/4
Slab / Foundation 0/6
Post Set 0/6
Siding / Roofing 0/11
Shutdown week — Crew B
OVERLAP
Permitting gold, dirt work brown, concrete slate, material delivery blue, post set orange — one colour per stage, on every bar. Real screen · sample data.
Without it

Two stages in near-identical blues merge into one block, and the office misreads which jobs are pouring this week.

Why we built it

The owner reads the board from the far side of the office, so colour has to carry meaning. A fixed set chosen so no two stages are confusable — and a stage you add keeping its own colour instead of grey — means one look says where every job is.

How it works
  1. 1Open Settings → Project Stages and pick a building type.
  2. 2Rename, reorder, add or remove stages so they read the way you build.
  3. 3Give each stage a colour and a default length.
  4. 4Add the checkpoints that belong inside it.
  5. 5Starting a job copies that list onto the job.
Why we built it

The default stage order put concrete before dirt work, which is backwards on every real site — you cannot pour a slab and then grade the pad underneath it. Every new job started from a plan the builder had to reorder by hand, and the ones nobody caught went out to crews wrong. Underneath it was worse: a renamed stage kept its old name and a newly added stage had no identity at all, so it could never carry a notification rule or an email template.

The problem
  • One rigid stage list for every kind of building
  • Stage names that don't match how a crew talks
  • Renamed stages silently losing their notification rules
What you get
Each building type carries its own realistic stage plan
Stage names match site language
Renames never orphan the automation bound to a stage
Starts from the stages a pole barn actually has, not a generic project template
What's inside
Stage colours you can read across a room

Twelve named colours — Amber, Slate Blue, Brown, Blue, Orange, Purple, Green, Teal, Red, Pink, Indigo, Charcoal. Stage colour is data, not decoration: it is how you read the board from the far side of the office. A stage you added yourself keeps its own colour instead of falling back to grey.

What this stage, and this checkbox, actually means

Write down what dirtwork actually includes, or what "ready for inspection" means, in your own words. It shows as a tip beside the stage title and beside each checkpoint. Unlike the labels, a correction reaches jobs already in progress the same day.

PROJECT STAGES

See stage templates by building type
on one of your own jobs.

Twenty minutes, your building, your numbers. Bring the job where “my stages aren't the same as everyone else's” — we will show you exactly where that stops.