Crew acceptance

Put a crew on a job and it has to say yes: your own men each tap Accept job on their phones, and a subcontractor crew's leader reads the brief and signs — or declines with a reason on the record.

The operating system for post-frame and barndominium builders.

Part of The Launch Pad
What it is

Two kinds of crew, two kinds of yes. Your own crews: you tick who's going, each man is texted and emailed his field link, and he taps Accept job — you are told every time someone does, and the job's header counts them, 2 of 3 accepted, with a Remind. A subcontractor crew signs: its leader sees the job, the customer, the address, the phases, the dates and what the crew stands to earn, then signs with a typed name and a drawn signature, or declines. Nothing is edited in place — every change of state adds a record. We build only for post-frame and barndominium builders, who run their own framing and slab crews and hire subs for doors and concrete — so each gets the right kind of yes.

Also called: crew signs for the job · sub agreement · crew lead signature · project acceptance · accept the job · crew accepts on phone · who's going

See it, piece by piece
01

Every crew on the job, and whether it has said yes

The job's header lists every crew on it, each with its own state. Your own crews count acceptances person by person — all 4 accepted, 2 of 3 accepted — and a subcontractor crew reads waiting to sign until its lead signs. Change the lead crew, add another, or take one off, right there. The crews themselves are set up on crews.

Project — who's on this job
Hoover 36×48 Garage
Post frame garageCrews:Framing Crew Aall 4 acceptedConcrete Crew2 of 3 acceptedRidge Overheadwaiting to sign+ Add crewDana Hoover
2210 Furnace Hill Rd, Clark, MO
The Hoover garage: Framing Crew A all in, the Concrete Crew at 2 of 3, Ridge Overhead still to sign. Real screen · sample data.
Without it

Three crews are on one garage and the only way to know who has agreed to turn up is to ring all three leaders.

Why we built it

Knowing who has said yes is what lets you promise a customer a date with a straight face. The answer sits on the job, where you are looking when you need it.

02

Pick who's going, and hear about every yes

Try it

For your own crew, tick who's going — the whole crew, or three of six for this slab. Each person gets a text and an email with his field link, plus a phone alert if he uses the app, and has to tap Accept job. You are told each time someone accepts, and anyone still waiting has a Remind beside his name.

Build Schedule — who's going
Crew
Concrete Crew on this job

Tick who’s going. Each person gets a text and an email with their field link, plus a phone alert if they use the app, and has to tap Accept job. You’ll be told each time someone accepts.

Levi EshWaiting to accept · told by text and email
Mark ZookAccepted Oct 8, 6:51 PM
Nate StoltzfusLeadAccepted Oct 8, 6:42 PM
CloseSave who’s going
Who's going on the Hoover slab: Mark and Nate accepted, Levi still waiting — Remind is one click. Real screen · sample data.
Without it

You split the concrete crew three to one slab and three to another, and by Monday nobody is sure who was meant to be where.

Why we built it

Being asked by name makes a man feel counted on — and being told the moment he says yes means you stop chasing. It turns "did everyone see it?" from a round of calls into a glance.

Sound familiar?“crew walked off a job halfway through”
03

Putting a subcontractor crew on a job is what creates its contract

Try it

Put a subcontractor crew on a job the way you always would and that act alone writes an acceptance waiting to be signed — and emails its lead to sign it. There is no second step, no separate document to remember, and no sub on a job with nothing in writing. Your own crews skip the paperwork and accept on their phones instead.

Crew card expanded
2
Projects
18
Stages Done
1
In Progress
-0.8d
Avg Variance
Current Project
Wenger 40×60 Shop
Framing — Day 3
Members (4)
MZ
Marlin ZookLEADER
(717) 555-0143 · marlin@stonebridge.demo.invalid
PlansTier 1 · $500
DE
Dwayne Esh
(717) 555-0168
PlansTier 2 · $400Leader
CL
Curtis Lapp
(717) 555-0117
PlansTier 3 · $350Leader
NB
Nelson Beiler
(717) 555-0192
PlansTier 4 · $270Leader
Assigned Projects (2)
Wenger 40×60 Shop4/7 stages
Beiler Barndominium0/6 stages
The crew on the job. Real screen · sample data.
Without it

The office means to get crew acceptance on every job. It happens on the big ones, and on the small ones somebody says they will sort it later. Later is the week the crew walks off and nobody can produce anything they agreed to.

Why we built it

Subs are the crews most likely to walk, and the ones you have least hold over — so their yes is the one that needs a signature. Hanging it off the assignment makes forgetting impossible rather than unlikely, on exactly the rushed jobs where it gets skipped.

Sound familiar?“nobody agreed to anything in writing”
04

The brief he actually reads before he signs

Not a signature line at the bottom of a blank page. The job, the customer, the address, the building type, the phases his crew owns with days against each, the start and end, the plans, and the project manager's notes — then Accept or Decline at the foot.

New project assignment
New project assignment
Wenger 40×60 Shop · Crew B
Your crew earns
$14,420.00
on successful completion of this project
Customer
Dwight & Ruth Hostetler
Address
1180 Mill Creek Rd, Bird-in-Hand
Building Type
40×60×16 Post-Frame Shop
Start
Sep 8, 2026
End
Sep 19, 2026
Phases your crew owns
1Site prep & layoutsitework2 days
2Posts & framingframing4 days
3Roof steelroofing2 days
4Siding & trimsiding3 days
View building plans
Notes from the project manager
Gravel pad is in and compacted. Overhead line runs along the north fence — keep the boom south of the posts. Owner wants the walk door on the east gable, not the plan side.
Accepting this project means your crew takes accountability for the phases above. You’ll sign to confirm, and the project manager will be notified immediately. If anything changes materially (dates, scope, payout), you’ll be asked to re-confirm.
DeclineAccept project
What the crew earns at the top, the phases they own, Accept or Decline at the foot. Real screen · sample data.
Without it

The crew turns up expecting a two-day pour and finds four. Everybody agrees somebody should have told them, nobody can say who, and the argument is settled by whoever shouts loudest — usually at the cost of the schedule.

Why we built it

A crew lead who knows the span, the dates and the sequence turns up ready — and can't say later he didn't know. A signature on something unread is worth nothing to either side, so the whole brief sits above the button.

Sound familiar?“crew says they never accepted that job”
06

They see their own money, and only their own

The brief shows what the crew stands to be paid and nothing else. Your margin is not on it, and neither is what the customer agreed to. Pay is transparent to the men doing the work; the rest of the job's economics are not theirs to see.

Crew payout
Crew payout
Crew A · figured for 12 days · 361h logged over 11 days
Refresh
Pool
$21,840
Day rates earned
$15,833
Fuel & equipment
$3,300
Surplus shared
$2,708
WhoTierHoursDaysDay ratesSurplusOwed
Levi YutzyTier 19611$5,500.00$720.00$6,220.00
Dwayne MillerTier 29210.5$4,200.00$690.00$4,890.00
Curt HershbergerTier 38810$3,500.00$660.00$4,160.00
Andre OcampoTier 4859.75$2,632.50$637.50$3,270.00
Total to the crew$18,540.00

Hours come from what the crew logged on their field links. Day rates are earned per day worked; the surplus is split by share of hours, so being there is what moves it.

What the crew is owed on this job. Real screen · sample data.
Without it

Either the crew is asked to accept a job without being told what it pays, which nobody sensible agrees to, or somebody forwards them the estimate and they discover the customer's number. From then on every conversation about their rate starts from your gross.

Why we built it

Nobody agrees to a job without knowing what it pays — but nobody needs to see your margin either. Showing the crew's own money, and only that, is fair to them and keeps every future rate conversation off your gross.

Sound familiar?“no accountability when a crew lead lets a job slide”
07

And the number is not invented for the occasion

What a crew stands to earn comes off the day rates and pool you already set — the same figures the payout runs on when the job is done, not a figure typed into a contract by whoever wrote it.

Pay tiers
Pay tiers

What one full day is worth at each tier. Crews paid by day rates are priced from these, and a person earns their tier’s rate for every day they work.

All tiers
$1,760
Tier 1$500/day
Tier 2$400/day
Tier 3$350/day
Tier 4$270/day
Tier 5$240/day
+ Add tier
The day rates the number is built from. Real screen · sample data.
Without it

The acceptance says one figure because somebody estimated it, and the payout says another because it was worked out properly at the end. The crew remembers the first number and the business pays the argument.

Why we built it

A crew remembers the number it was promised — so the promise and the payout have to be the same number. Reading both off one set of rates means what they signed for is what they get paid.

08

Your agreement, in your words, versioned

Try it

The body is your text with fill-in placeholders — labour total, project name, customer, today's date. Edit it once and every future acceptance carries it; saving makes a new version and already-signed ones keep the wording they were signed on.

Sub agreement editor
Sub Agreement

The acceptance contract your crew leads sign when they take a project. Use your own agreement text — the placeholders below fill in automatically for each project when the lead signs.

Fill-in placeholders
{{labor.amount}} — labor total from the approved estimate (e.g. $11,262.50)
{{project.name}} — project name
{{customer.name}} — customer name
{{date.today}} — today's date
PROJECT ACCEPTANCE AGREEMENT I, the undersigned crew lead, am signing this agreement personally — not on behalf of any other person — and I accept the project assignment described in this document under the following terms: 1. PERSONAL COMMITMENT I personally commit to completing {{project.name}} for {{customer.name}} according to the project plan, schedule, and quality standards established by the company. Walking off the project without prior written authorization from company management is a breach of this agreement. 2. LABOUR The labour figure for this project is {{labor.amount}}, as agreed on {{date.today}}.
Current: version 3
The acceptance agreement, in settings. Real screen · sample data.
Without it

Crew terms live in a Word file that gets printed when somebody remembers. Which crews accepted which version of it is a question with no answer, because the file has been edited eleven times and never versioned.

Why we built it

Your crews are agreeing to your terms, in your words — that is what makes it stand up. We automate the assembly and the record; the wording stays yours, and every signed copy keeps the version it was signed on.

Sound familiar?“sent the job in a group text and nobody confirmed”
09

A refusal is a record, not a phone call nobody logged

Declining asks why, from reasons you can pick rather than a text box nobody fills in. The office is told immediately, and the reason sits on the crew's record beside every job they did accept.

Why are you declining?
Why are you declining?
Wenger 40×60 Shop · Crew B
Tell us why — this helps the project manager reassign or adjust. You can pick more than one.
Pay doesn’t match the scope of work
Schedule conflict with another project
Too many jobs back-to-back — need breathing room
Timeline too tight — need more prep time
Travel distance / commute too far
Equipment or tools not available for this build
Crew is already at full capacity
Scope is outside our current skill set or experience
Concerns about materials quality, gauge, or specs
Site access or safety concerns
Site prep or foundation isn’t ready
Weather or seasonal conditions
Concerns about the client (communication, expectations, history)
Need more project details before committing
Personal / family reason
Other (please specify below)
BackSubmit decline
Declining, with reasons on the record. Real screen · sample data.
Without it

A crew says no on the phone to whoever answered. It gets rescheduled and forgotten. Three months later nobody can say why that crew never takes the barndominiums, or that they have been telling you the reason each time.

Why we built it

A no with a reason tells you something you need to hear — that a crew keeps turning down barndominiums, or always for the same reason. One decline is scheduling; four for the same reason is a pattern, and you only see it if refusals are captured like acceptances.

Sound familiar?“don't know which of my guys have seen the new job”
10

The office sees it on the crew, not buried in the job

Every subcontractor crew's own record carries what is still awaiting signature at the top — with a resend button — and everything already answered beneath it, accepted or declined, dated, with the decline reasons attached. When several crews share a job, each crew's lead signs his own, even if another crew on the job has already signed.

Crew acceptance, on the crew's record
Crew acceptance — Crew B

On the crew’s own record in Team, not buried in the job.

New project awaiting acceptanceWenger 40×60 Shop1180 Mill Creek Rd, Bird-in-HandResend
Already answered
Stoltzfus 30×40 ShopAcceptedAug 19, 2026
Address884 Gap Newport Pike, Gap
Building30×40×14 Post-Frame Shop
Byler BarndominiumDeclinedAug 11, 2026
Address1720 Hollow Oak Rd, Christiana
Building36×60×16 Barndominium
  • Already committed that week
  • Not enough men for the span
Crew acceptance on the crew's own record, in Team. Real screen · sample data.
Without it

Acceptance status lives inside each job. Finding out whether one crew has signed everything means opening six jobs one at a time, so nobody checks and the gaps are found by accident.

Why we built it

The office's question is about a crew — "is Ridge Overhead signed up for everything we gave them?" Filing it on the crew answers that by opening one card instead of six jobs.

11

Chasing what is unsigned is a button, not an afternoon

Try it

One queue of every subcontractor acceptance still outstanding across every job, with the resend on the row. Your own crews are followed on their cards and in each job's header instead, where Remind sits beside anyone who hasn't tapped Accept. You work a list rather than remembering one.

Pending contracts queue
Pending Contracts
Projects awaiting a signed acceptance contract from the assigned crew lead.
3 OPEN
Everything still unsigned, in one place. Real screen · sample data.
Without it

Somebody in the office is supposed to keep an eye on which crews have signed. They do, until a busy week, and the ones that slipped are the jobs already framed by the time anyone notices.

Why we built it

Unsigned paperwork is never urgent on the day and always urgent later. A list that builds itself turns a memory job into a two-minute one, before the job is framed.

Sound familiar?“need my subs to sign before they start”
12

Frozen the moment it is signed

Typed name plus a drawn signature, with the time and the brief exactly as it stood. Later edits to the job do not reach backwards — what he signed stays what he signed, and if the dates or the payout change materially he is asked to re-confirm.

Signed acceptance record
Print / Save PDF
PROJECT ACCEPTANCE AGREEMENT
Signed and witnessed electronically · Agreement v2
Project
NameWenger 40×60 Shop
CustomerDwight & Ruth Hostetler
Phone(717) 555-0104
Address1180 Mill Creek Rd, Bird-in-Hand
Building Type40×60×16 Post-Frame Shop
Assigned CrewCrew B
Signer
Full NameMarlin Zook
Emailmarlin@stonebridge.demo.invalid
Phone(717) 555-0143
Rolecrew lead
Signed AtSep 8, 2026, 7:12 AM
IP Address203.0.113.47
Agreement Terms
PROJECT ACCEPTANCE AGREEMENT I, the undersigned crew lead, am signing this agreement personally — not on behalf of any other person — and I accept the project assignment described in this document under the following terms: 1. PERSONAL COMMITMENT I personally commit to completing Wenger 40×60 Shop for Dwight & Ruth Hostetler according to the project plan, schedule, and quality standards established by the company. 2. LABOUR The labour figure for this project is $14,420.00, as agreed on September 8, 2026.
Typed Signature
Marlin Zook
Signed
Sep 8, 2026, 7:12 AM
Drawn Signature
Signed
Sep 8, 2026, 7:12 AM
Audit Trail
User AgentMozilla/5.0 (iPhone; CPU iPhone OS 18_2 like Mac OS X) AppleWebKit/605.1.15 Safari/604.1
Signature IDc1f0a6e2-4d31-4a9c-9f21-88b0d4e7a115
Assignment ID7b4e19c8-2a55-41d0-b6ef-3d9a2c70f884
This document is a legally binding electronic record under applicable e-signature law. Any modification of this record renders it invalid.
The signed record, as it was signed. Real screen · sample data.
Without it

The job changes after the crew signs — two extra days, a phase moved, a different payout — and the acceptance silently updates. The crew is now on record agreeing to something they never saw, which is worse than having no record at all.

Why we built it

A crew needs to know the deal it signed is the deal it gets — and so do you. A record that follows the job's current state is not a record; freezing it, and asking again when the dates or pay change, keeps it honest.

How it works
  1. 1Put a crew on the job — from the job's header, alongside any other crews already on it.
  2. 2Your own crew: tick who's going. Each man is texted and emailed his field link (plus a phone alert if he uses the app).
  3. 3He taps Accept job on his phone. You are told every time, and the header reads 2 of 3 accepted, with Remind beside anyone still waiting.
  4. 4A subcontractor crew: its leader is emailed the acceptance contract and signs from Team or from the job.
  5. 5He reads the brief — job, customer, address, phases, dates and the crew's pay — and signs with a typed name and a drawn signature.
  6. 6Or he declines with reasons, and the job needs a new crew.
Why we built it

A crew that walks off a job halfway through leaves the builder holding a promised date and nobody to hit it — and a verbal yes is worth nothing at that point. For a subcontractor crew that means a document its lead signs before work starts: a personal commitment to the job, responsibility for the men under his direction, and a clause requiring any incoming lead to sign the same thing. Signatures are permanent. For your own crews a contract was the wrong tool — the problem was simpler: jobs went out over group texts and nobody could prove a man had seen one. So each man going now taps Accept on his own phone, and the person who put him on the job hears about every acceptance.

The problem
  • Jobs sent over group texts with no proof anyone saw them.
  • Crew commitments existing only as a verbal understanding.
  • No record of who accepted a job or on what terms.
  • Reassignments with no handoff paperwork.
What you get
Every man on your own crew says yes himself — nobody can claim he never saw the job.
You are told the moment each one accepts, and can remind the one who hasn't.
A signed, permanent record for every subcontractor crew that starts a job.
Declines become data instead of a phone call nobody logged.
What's inside
Crew lead signs before work starts

For a subcontractor crew, the agreement covers personal commitment (walking off without written authorisation is a breach), responsibility for the crew under that lead, reporting, safety, code compliance and handover on reassignment. Every change of state adds a record rather than overwriting one, so the history reads end to end. Signatures cannot be altered.

Your own crew agreement, versioned

Builders have their own crew agreements — wording their lawyers have already been through — and a generic one they cannot change is one they will not use. Editing yours saves a new version and retires the old one, so every signed acceptance still points at the exact text its signer read. Admin only.

Typed name and drawn signature

A signature pad that draws cleanly at any size, on a phone or a laptop. Nothing signs without a typed name, ink on the pad and a ticked acknowledgement.

The signed record is frozen

An agreement stored as a pointer to a template is an agreement that changes after it was signed. What is kept instead is the document as it appeared at the moment of signing, with the job's details of that moment, frozen.

Why a crew turned a job down

A crew turning down a job used to be a phone call, so the reason lived with whoever took it. Now the same reason means the same thing everywhere it is counted — and what you get is not one refusal but a count.

The crew lead gets the contract by email

A contract waiting on a signature the signer has not been told about is a contract that just waits. The email goes out as soon as the subcontractor crew is assigned. Where no address can be found for the leader, it goes to someone on the crew who has one. An in-house crew never gets this email — each man going taps Accept job on his phone.

Read and print the signed contract

Opening a contract that had not been signed yet used to show a blank page, so nobody could read what they were about to be asked to sign. Signed or waiting, the whole document renders: the agreement text, the job's details, and the signature once there is one.

Swapping crews mid-job

Taking a job off one crew and handing it to another used to erase the fact that the first crew had ever held it, along with the agreement they signed. Now the old assignment stays on the record with its signature intact and a reason for the change, and an incoming subcontractor lead signs the same agreement before taking over.

Signed, waiting, or never sent

Whether a crew had actually signed for a job used to take a phone call, and the answer arrived after the crew was already meant to be on site. Three states, on the job, at a glance. Signed and waiting open the document; never sent is informational, because there is nothing yet to show. With several crews on a job the office sees the lead crew's, and each crew lead sees and signs his own.

The crew sees their pay, not your price

The document a crew lead signs has to state the job, the scope and what the crew is paid. None of that requires him to see what the customer was charged. The only money on it is the crew's own.

CREW ACCEPTANCE

See crew acceptance
on one of your own jobs.

Twenty minutes, your building, your numbers. Bring the job where “crew walked off a job halfway through” — we will show you exactly where that stops.

leads2build.com
Crew acceptance — Leads2Build