Extra, missing and damaged material

Record extra, missing and damaged material against the stage where it was found, item by item.

The operating system for post-frame and barndominium builders.

What it is

A Materials Check fold in the stage details of every framing, siding & roofing and material-delivery stage, holding three lists: Extra Materials (what, and why — previous job, over-ordered, wrong item), Missing Materials (what, the reason — not ordered, short shipped, not delivered — and the plan to fix it) and Damaged Materials (what, the cause — delivery damage, site damage, defective — what happened, and the replacement). Each list's header shows the count, or Tap to report. Made for builders whose loads are trusses, posts, purlins and steel — post-frame and barndominiums, nobody else.

Also called: short shipped · damaged material · missing parts · material shortage · leftover material

See it, piece by piece
01

Short shipments recorded item by item, against the stage they held up

Try it

Three lists on the framing, siding & roofing and material stages: extra material and why it's there, missing material with the reason and the plan, and damaged material with the cause and what the replacement is. The reasons are a tap, not a paragraph. Short shipments, damaged panels and the wrong trim are the most common reason a post-frame stage slips, and they were reported by phone call to whoever picked up. Nothing was written down.

Materials check
Materials CheckFraming · Zimmerman 40×72 Shop
6 × 29ga white wall panel, 16'
Short shipped — reorder on Thursday's truck
1 × 3'0 walk door jamb
Not delivered — supplier confirms backorder
Material + qty needed
Not orderedShort shippedNot delivered
Resolution plan
Add
Materials Check on a framing stage — the missing list open. Real screen · sample data.
Without it

Six panels short gets mentioned on a call, nobody writes it down, and the reorder never happens.

Why we built it

The crew lead writes down the short trim the moment he finds it, instead of telling whoever answers the phone. Itemised against the stage it held up, it becomes something the office can act on — and the replacement gets ordered that day.

Sound familiar?“supplier short shipped and I have nothing written down”
02

At the tailgate, short and damaged go on the order with a photo

Try it

When the truck is unloaded, the receiving side of the order sheet takes the same problems with their evidence — six steel panels short, two creased along the rib — each line with its note and a photo, so the claim to the yard starts from a record. The supplier has paperwork; now you do too.

Short and damaged — with the photo
Report what was wrong

Short and damaged go on the order with a photo, so the credit conversation starts from a record.

6 shortRibbed steel wall panel, 11.0′61 of 67
Six panels not on the truck. Driver confirmed and signed the sheet.Claim a creditReorder shortAdd another photo
2 damagedGable-end wall steel (cut to rake)17 of 17
Two creased along the rib on the top of the bundle — strapping cut into them in transit.Claim a creditReorder shortAdd another photo

The photo travels with the claim. Three weeks later nobody has to remember which bundle it was.

Short and damaged lines on the order, each with its photo. Real screen · sample data.
Without it

The supplier has a signed delivery ticket and you have a phone call somebody half remembers, so the credit never lands.

Why we built it

The office stops arguing with the supplier from memory. A dated photo against a named line on a named job is what a credit is built on — and it exists whether or not you end up needing it.

Sound familiar?“damaged panels and no record of it”
03

A complaint about the yard becomes a list with dates on it

Once shortages are written against the stage they held up, a running complaint turns into something you can put in front of the supplier's rep with dates on it. It also settles the internal version of that argument, where the crew blames the yard and the yard blames the crew.

Without it

Everyone knows one yard is always short, but with nothing written down the rep shrugs and nothing changes.

Why we built it

The owner walks into the supplier meeting with dates, not a grudge. It also settles the version of the argument inside your own company, where the crew blames the yard and the yard blames the crew.

Sound familiar?“leftover material nobody accounts for”
04

The leftovers get accounted for as well as the shortages

Extra material is logged with a reason — previous job, over-ordered, wrong item — so a pile of posts nobody can explain becomes a line against the job it came off. It is also the honest half of the record: a builder who claims shortages and never logs an over-ship stops being believed.

Without it

A pile of posts nobody can explain sits behind the shop all season and never gets charged to the job it came off.

Why we built it

The crew gets credit for being straight, and the office knows where the extra posts came from. A builder who logs over-ships as well as shortages is a builder the supplier believes.

How it works
  1. 1Open the stage and open the Materials Check.
  2. 2Add what is missing, why, and the plan to fix it.
  3. 3Add what is damaged, the cause, and the replacement.
  4. 4Add what turned up extra, and where it came from.
  5. 5Each list's header carries the count from then on.
Why we built it

Short shipments, damaged panels and the wrong trim are the most common reason a post-frame stage slips, and they were reported by phone call to whoever picked up. Nothing was written down, so the supplier conversation ran on memory against a supplier with paperwork — and "which supplier costs us the most days" had no answer at all.

The problem
  • Material discrepancies recorded only in conversation
  • No evidence trail for a supplier claim
What you get
Itemised record tied to the stage and the job
A basis for supplier claims and delay analysis
Reasons chosen from the ones a pole-barn load actually goes wrong by
PROJECT WORKSPACE

See extra, missing and damaged material
on one of your own jobs.

Twenty minutes, your building, your numbers. Bring the job where “supplier short shipped and I have nothing written down” — we will show you exactly where that stops.

leads2build.com
Windows set into a finished wall
Materials check
Materials CheckFraming · Zimmerman 40×72 Shop
6 × 29ga white wall panel, 16'
Short shipped — reorder on Thursday's truck
1 × 3'0 walk door jamb
Not delivered — supplier confirms backorder
Material + qty needed
Not orderedShort shippedNot delivered
Resolution plan
Add
Construction Material Tracking: Extra, Missing and Damaged